立即开始
AgencyZoom Tools

Agencyzoom Change Status For Lead

通过 Aident Loadout 使用 AgencyZoom Tools 的 Agencyzoom Change Status For Lead。执行前查看输入、输出、设置、价格和风险。

写入操作风险等级 2/5API 密钥连接

服务提供商说明

Updates a lead's lifecycle status (e.g., Active, Won, Lost, X-Dated) and can optionally manage its workflow, pipeline, stage, source, or associated tags.

价格与限制

价格
免费操作
统一支付
暂不支持

输入

  • datestring
    Date for the status change. If status is 5 (XDATED), this is the reactivation date (e.g., 'YYYY-MM-DD'); otherwise, it can be contact or quoted date.
  • leadIdinteger
    必填
    Unique identifier of the lead to be updated (path parameter).
  • statusinteger
    必填
    New status for the lead: 0 (ACTIVE), 2 (WON), 3 (LOST), 5 (XDATED).
  • tagIdsarray
    List of tag IDs to associate with the lead.
  • toStageIdinteger
    ID of a specific workflow stage for direct assignment, irrespective of recycling.
  • xDateTypestring
    Type or reason for the X-date, used if status is 5 (XDATED) (e.g., a predefined X-date recycle event name).
  • workflowIdinteger
    Identifier of the workflow to associate; if provided, the lead moves to this workflow.
  • lossReasonIdinteger
    Identifier for the loss reason. Recommended if status is 3 (LOST).
  • recycleToStageinteger
    ID of the stage to move the lead to if it is being recycled.
  • workflowStageIdinteger
    Identifier of the stage within the specified workflow to move the lead to.
  • recycleToPipelineinteger
    ID of the pipeline to move the lead to if it is being recycled.
  • changeLeadSourceTointeger
    Identifier for a new lead source to assign, updating the lead's origin.

可观察输出

  • data
    必填
    Data from the action execution
  • errorstring
    Error if any occurred during the execution of the action
  • successfulboolean
    必填
    Whether or not the action execution was successful or not

使用此操作的技能

相关使用场景

尚未关联经过验证的相关使用场景。

官方来源

服务提供商来源